
By Bin and Gone | Updated October 9, 2026
Describe the whole project
Tell the team whether the work is a few fence panels or a larger deck removal. Mention metal brackets, posts, railings and any dense material. Photos and rough dimensions help distinguish a bulky timber load from one with substantial weight. Do not include concrete or soil without explicit approval.
Plan the route from the garden
The bin may sit in the driveway while the waste begins at the back of the property. Check gates, steps and the carrying route before demolition. Keep sharp fasteners controlled and avoid piles that block pedestrian access. The customer is responsible for loading approved materials.
Keep the bin inside the agreed limits
Do not balance boards above the rim or rely on a light-looking load to stay within the weight allowance. Follow the agreed loading instructions. The rental includes a 1 ton minimum package; additional tons are charged separately. Ask for advice if the material list changes.
Coordinate collection with the next delivery
A new timber delivery and bin pickup can compete for driveway space. Agree on the sequence, leave truck access clear and contact the team if construction is delayed. The standard seven-day rental is included; extra time needs a separate agreement.
A helpful answer
Can concrete fence-post footings go in the bin?
Do not assume so. Confirm dense-material acceptance and loading limits separately before booking. Cinder blocks are not accepted.
Continue planning
Compare bin dimensions, check material acceptance and review the HST-included rental package. Call 289-356-0228 to confirm your project.
Local reference: Clarington garbage and recycling guidance. Municipal guidance does not replace the material agreement for your rental.
